Skip to content
SalMar Tjuin, Steinkjer

SalMar Tjuin

New smolt facility at Tjuin in Steinkjer for SalMar, approx. 17,000 m². The plant is built around recirculating aquaculture system (RAS) technology with stringent requirements for hygiene, biosecurity and operational efficiency. The layout has been developed to ensure good flow between fish phases, robust technical rooms and flexibility for future operations. The practice delivered the schematic design and the detailed design and followed the construction.